Cargando…
Design and development of the DAQ and Timing Hub for CMS Phase-2
The CMS detector will undergo a major upgrade for Phase-2 of the LHC program, starting around 2026. The upgraded Level-1 hardware trigger will select events at a rate of 750 kHz. At an expected event size of 7.4 MB this corresponds to a data rate of up to 50 Tb/s. Optical links will carry the signal...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.343.0129 http://cds.cern.ch/record/2649128 |