Cargando…
Design and development of the DAQ and Timing Hub for CMS Phase-2
The CMS detector will undergo a major upgrade for Phase-2 of the LHC program, starting around 2026. The upgraded Level-1 hardware trigger will select events at a rate of 750 kHz. At an expected event size of 7.4 MB this corresponds to a data rate of up to 50 Tb/s. Optical links will carry the signal...
Ejemplares similares
-
The CMS Data Acquisition System for the Phase-2 Upgrade
por: André, Jean-Marc, et al.
Publicado: (2018) -
Experience with dynamic resource provisioning of the CMS online cluster using a cloud overlay
por: Da Silva Gomes, Diego, et al.
Publicado: (2018) -
Operational experience with the new CMS DAQ-Expert
por: Sakulin, Hannes, et al.
Publicado: (2018) -
The CMS event-builder system for LHC run 3 (2021-23)
por: Mommsen, Remigius, et al.
Publicado: (2018) -
Presentation layer of CMS Online Monitoring System
por: André, Jean-Marc, et al.
Publicado: (2018)