Cargando…
Faulty Connections in the Beam Position Monitors and their effect on the Beam
In the BE-Newsletter issue 24 in December 2018 it was introduced that the instabilities regarding the PSB extraction kicker were produced by unmatched termination of cables. The same type of vertical instabilities were also seen in LEIR. This was also caused by a mismatch at the strip-line beam posi...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2687361 |