Cargando…
Handover of key to PS Booster accelerator operation team in the CCC
Handing over a symbolic key at the start of the recommissioning of the accelerators at the end of Long Shutdown 2 (LS2) in the CCC. The PS Booster is the first accelerator to be recommissioned, alongside Linac 4. Here David Hay, who is responsible for LS2 coordination at the PS Booster, hands over a...
Autor principal: | |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2722744 |