Cargando…
Handover of key to PS Booster accelerator operation team in the CCC
Handing over a symbolic key at the start of the recommissioning of the accelerators at the end of Long Shutdown 2 (LS2) in the CCC. The PS Booster is the first accelerator to be recommissioned, alongside Linac 4. Here David Hay, who is responsible for LS2 coordination at the PS Booster, hands over a...
Autor principal: | |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2722744 |
_version_ | 1780965911114547200 |
---|---|
author | Ordan, Julien Marius |
author_facet | Ordan, Julien Marius |
author_sort | Ordan, Julien Marius |
collection | CERN |
description | Handing over a symbolic key at the start of the recommissioning of the accelerators at the end of Long Shutdown 2 (LS2) in the CCC. The PS Booster is the first accelerator to be recommissioned, alongside Linac 4. Here David Hay, who is responsible for LS2 coordination at the PS Booster, hands over a symbolic key to Bettina Mikulec, who leads the operations team for the PS Booster and Linac 4. On the left, Julie Coupard, who is in charge of LS2 coordination for the injectors, and on the right, Gian Piero Di Giovanni, LHC Injector Upgrade (LIU) project leader for the PS Booster, and Rende Steerenberg, Operations group leader. |
id | cern-2722744 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2020 |
record_format | invenio |
spelling | cern-27227442021-03-08T14:56:08Zhttp://cds.cern.ch/record/2722744Ordan, Julien MariusHandover of key to PS Booster accelerator operation team in the CCCPhotolabHanding over a symbolic key at the start of the recommissioning of the accelerators at the end of Long Shutdown 2 (LS2) in the CCC. The PS Booster is the first accelerator to be recommissioned, alongside Linac 4. Here David Hay, who is responsible for LS2 coordination at the PS Booster, hands over a symbolic key to Bettina Mikulec, who leads the operations team for the PS Booster and Linac 4. On the left, Julie Coupard, who is in charge of LS2 coordination for the injectors, and on the right, Gian Piero Di Giovanni, LHC Injector Upgrade (LIU) project leader for the PS Booster, and Rende Steerenberg, Operations group leader.CERN-PHOTO-202007-095oai:cds.cern.ch:27227442020 |
spellingShingle | Photolab Ordan, Julien Marius Handover of key to PS Booster accelerator operation team in the CCC |
title | Handover of key to PS Booster accelerator operation team in the CCC |
title_full | Handover of key to PS Booster accelerator operation team in the CCC |
title_fullStr | Handover of key to PS Booster accelerator operation team in the CCC |
title_full_unstemmed | Handover of key to PS Booster accelerator operation team in the CCC |
title_short | Handover of key to PS Booster accelerator operation team in the CCC |
title_sort | handover of key to ps booster accelerator operation team in the ccc |
topic | Photolab |
url | http://cds.cern.ch/record/2722744 |
work_keys_str_mv | AT ordanjulienmarius handoverofkeytopsboosteracceleratoroperationteamintheccc |