Cargando…

The Prototype Hardware Design of Global Common Module for Global Trigger System of the ATLAS Phase-II Upgrade on HL-LHC

The HL-LHC [1] is expected to start operations in the middle of 2027, to deliver more than ten times the integrated luminosity of the LHC Runs 1-3 combined (up to 4000 fb−1). Meeting these requirements poses significant challenges to the hardware design of Trigger and Data Acquisition system. A base...

Descripción completa

Detalles Bibliográficos
Autores principales: Tang, Shaochun, Begel, Michael, Benoit, Mathieu, Bonini, Filiberto, Chen, Hucheng, Chen, Kai, Filimonov, Viacheslav, Liu, Hongbin, Matakias, Dimitrios, Qian, Weiming, Sankey, Dave, Ta, Duc Bao, Xu, Hao, Yin, Weigang, Zhivun, Elena
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:http://cds.cern.ch/record/2744107