Cargando…

Surface and underground civil engineering at HiLumi Point 1

In the US/UW17 cavern, next to the ATLAS experiment site, the final lining is completed. Paint work and steel structures are on-going. On the surface, the waterproofing is finished at the PM17 shaft. This shaft leads down and reaches the LHC tunnel.

Detalles Bibliográficos
Autor principal: Fernandes Morais, Milton Filipe
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2756243