Cargando…
Surface and underground civil engineering at HiLumi Point 1
In the US/UW17 cavern, next to the ATLAS experiment site, the final lining is completed. Paint work and steel structures are on-going. On the surface, the waterproofing is finished at the PM17 shaft. This shaft leads down and reaches the LHC tunnel.
Autor principal: | Fernandes Morais, Milton Filipe |
---|---|
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2756243 |
Ejemplares similares
-
HiLumi Photo Contest 2018: The Beauty of Engineering
por: Gallifa Terricabras, Adria, et al.
Publicado: (2018) -
HiLumi Welcome Day - May 2022
por: Garcia Obrero, Irene
Publicado: (2022) -
HiLumi Welcome Day - February 2023
por: Garcia Obrero, Irene
Publicado: (2023) -
HiLumi Welcome Day - September 2022
por: Garcia Obrero, Irene
Publicado: (2022) -
HiLumi Welcome Day, the October edition
por: Garcia Obrero, Irene
Publicado: (2023)