Cargando…

Installation of the Fast Interaction Trigger (FIT) detector in the ALICE cavern

Installation of the A-side of the FIT (Fast Interaction Trigger) detector in the ALICE cavern during LS2 (June 2021).

Detalles Bibliográficos
Autor principal: Trzaska, Wladyslaw Henryk
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2773786