Cargando…
Installation of the Fast Interaction Trigger (FIT) detector in the ALICE cavern
Installation of the A-side of the FIT (Fast Interaction Trigger) detector in the ALICE cavern during LS2 (June 2021).
Autor principal: | |
---|---|
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2773786 |