Cargando…

Hybrids Acceptance Tools for the CMS Phase Two Tracker Upgrade

<!--HTML-->Up to fifty thousand front-end and service hybrids are required for the CMS Tracker Phase Two Upgrade. These hybrids, which are built on carbon fibre stiffened circuits and contain several flip-chip ASICs, will be glued in module structures, making repairs almost impossible. Due to...

Descripción completa

Detalles Bibliográficos
Autor principal: Mateos Dominguez, Irene
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2782898