Cargando…
Hybrids Acceptance Tools for the CMS Phase Two Tracker Upgrade
<!--HTML-->Up to fifty thousand front-end and service hybrids are required for the CMS Tracker Phase Two Upgrade. These hybrids, which are built on carbon fibre stiffened circuits and contain several flip-chip ASICs, will be glued in module structures, making repairs almost impossible. Due to...
Autor principal: | Mateos Dominguez, Irene |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2782898 |
Ejemplares similares
-
Hybrids Acceptance Tools for the CMS Phase-2 Tracker Upgrade
por: Blanchot, Georges, et al.
Publicado: (2021) -
Software Tools for Hybrid Quality Control for the CMS Phase-2 Outer Tracker Upgrade
por: Mateos Dominguez, Irene, et al.
Publicado: (2022) -
Power, Readout and Service Hybrids for the CMS Phase-2 Upgrade
por: Zografos, Angelos
Publicado: (2021) -
Front-end hybrid designs for the CMS Phase-2 Upgrade towards the production phase
por: Kovacs, Mark Istvan
Publicado: (2021) -
Timing for the CMS Phase-II Upgrade
por: Martinez Ruiz Del Arbol, Pablo
Publicado: (2020)