Exploiting the Beam-Beam Wire Demonstrators in the Next LHC Run 3
After the successful experiments performed during the LHC Run 2 with the Beam-Beam Wire demonstrators installed, on Beam 2, in the frame of the HL-LHC project, two of the four wire demonstrators were moved to Beam 1. The objective is to gain operational experience with the wire compensation also on...