Cargando…

Exploiting the Beam-Beam Wire Demonstrators in the Next LHC Run 3

After the successful experiments performed during the LHC Run 2 with the Beam-Beam Wire demonstrators installed, on Beam 2, in the frame of the HL-LHC project, two of the four wire demonstrators were moved to Beam 1. The objective is to gain operational experience with the wire compensation also on...

Descripción completa

Detalles Bibliográficos
Autores principales: Poyet, Axel, Fartoukh, Stephane, Karastathis, Nikolaos, Papaphilippou, Yannis, Rossi, Adriana, Skoufaris, Kyriacos, Sterbini, Guido
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2021-MOPAB008
http://cds.cern.ch/record/2783792

Ejemplares similares