Cargando…
Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0
In 2019-2020, the first of the CMS gas electron multiplier (GEM) systems, GE1/1, was installed into the CMS muon endcaps, to be fully operational by Run 3. This represents the first of three major GEM-based additions into CMS, to be followed in future runs by GE2/1 and the very forward muon tagger M...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.390.0874 http://cds.cern.ch/record/2790628 |