Cargando…

Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0

In 2019-2020, the first of the CMS gas electron multiplier (GEM) systems, GE1/1, was installed into the CMS muon endcaps, to be fully operational by Run 3. This represents the first of three major GEM-based additions into CMS, to be followed in future runs by GE2/1 and the very forward muon tagger M...

Descripción completa

Detalles Bibliográficos
Autor principal: Starling, Elizabeth Rose
Lenguaje:eng
Publicado: SISSA 2021
Materias:
Acceso en línea:https://dx.doi.org/10.22323/1.390.0874
http://cds.cern.ch/record/2790628
_version_ 1780972256462110720
author Starling, Elizabeth Rose
author_facet Starling, Elizabeth Rose
author_sort Starling, Elizabeth Rose
collection CERN
description In 2019-2020, the first of the CMS gas electron multiplier (GEM) systems, GE1/1, was installed into the CMS muon endcaps, to be fully operational by Run 3. This represents the first of three major GEM-based additions into CMS, to be followed in future runs by GE2/1 and the very forward muon tagger ME0. R&D; for these two future systems is currently well under way, with a focus on eliminating potential damage due to propagating electrical discharges within the detector, as was seen in the demonstrator system for GE1/1. This contribution presents results from the various mitigation strategies, including changes to the front-end readout electronics and to the construction of the detectors themselves. These results detail the reduction in propagating discharges from the various strategies, as well as unintended consequences of those strategies, such as the presence of bipolar cross-talk signals in chambers equipped with double-segmented GEM foils. Future prospects for the two systems will be discussed.
id cern-2790628
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
publisher SISSA
record_format invenio
spelling cern-27906282021-11-16T19:52:04Zdoi:10.22323/1.390.0874http://cds.cern.ch/record/2790628engStarling, Elizabeth RoseElectrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0Detectors and Experimental TechniquesIn 2019-2020, the first of the CMS gas electron multiplier (GEM) systems, GE1/1, was installed into the CMS muon endcaps, to be fully operational by Run 3. This represents the first of three major GEM-based additions into CMS, to be followed in future runs by GE2/1 and the very forward muon tagger ME0. R&D; for these two future systems is currently well under way, with a focus on eliminating potential damage due to propagating electrical discharges within the detector, as was seen in the demonstrator system for GE1/1. This contribution presents results from the various mitigation strategies, including changes to the front-end readout electronics and to the construction of the detectors themselves. These results detail the reduction in propagating discharges from the various strategies, as well as unintended consequences of those strategies, such as the presence of bipolar cross-talk signals in chambers equipped with double-segmented GEM foils. Future prospects for the two systems will be discussed.SISSAoai:cds.cern.ch:27906282021
spellingShingle Detectors and Experimental Techniques
Starling, Elizabeth Rose
Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0
title Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0
title_full Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0
title_fullStr Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0
title_full_unstemmed Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0
title_short Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0
title_sort electrical discharge mitigation strategies for future cms gem systems ge2/1 and me0
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.22323/1.390.0874
http://cds.cern.ch/record/2790628
work_keys_str_mv AT starlingelizabethrose electricaldischargemitigationstrategiesforfuturecmsgemsystemsge21andme0