Cargando…
Electrical Discharge Mitigation Strategies for Future CMS GEM Systems GE2/1 and ME0
In 2019-2020, the first of the CMS gas electron multiplier (GEM) systems, GE1/1, was installed into the CMS muon endcaps, to be fully operational by Run 3. This represents the first of three major GEM-based additions into CMS, to be followed in future runs by GE2/1 and the very forward muon tagger M...
Autor principal: | Starling, Elizabeth Rose |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.390.0874 http://cds.cern.ch/record/2790628 |
Ejemplares similares
-
Advanced aging study on Triple GEMs for CMS GE2/1 and ME0
por: Fiorina, Davide
Publicado: (2020) -
Reduction of high voltage discharge in GEM detectors for the ME0 station of the CMS forward muon system
por: Mohamed, Salwa, et al.
Publicado: (2022) -
Detection and Mitigation of Propagating Electrical Discharges Within the Gas Electron Multiplier Detectors of the CMS Muon System for the CERN HL-LHC
por: Starling, Elizabeth Rose
Publicado: (2020) -
Discharge mitigation strategies for GE11 detectors in the CMS Experiment
por: Ivone, Francesco
Publicado: (2019) -
Rate Capability and Discharge Behaviour of ME0 triple-GEM detector
por: Slaston, Yevhenii
Publicado: (2022)