Cargando…

Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade

The HL-LHC will start operations in 2027, to deliver more than ten times the integrated luminosity of the LHC Runs 1-3 combined. Meeting these requirements poses significant challenges to the hardware design of the Trigger and Data Acquisition system. Global Trigger is a new subsystem, which will pe...

Descripción completa

Detalles Bibliográficos
Autores principales: Bonini, Filiberto, Tang, Shaochun
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2791015