Cargando…
Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade
The HL-LHC will start operations in 2027, to deliver more than ten times the integrated luminosity of the LHC Runs 1-3 combined. Meeting these requirements poses significant challenges to the hardware design of the Trigger and Data Acquisition system. Global Trigger is a new subsystem, which will pe...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2791015 |
_version_ | 1780972289247936512 |
---|---|
author | Bonini, Filiberto Tang, Shaochun |
author_facet | Bonini, Filiberto Tang, Shaochun |
author_sort | Bonini, Filiberto |
collection | CERN |
description | The HL-LHC will start operations in 2027, to deliver more than ten times the integrated luminosity of the LHC Runs 1-3 combined. Meeting these requirements poses significant challenges to the hardware design of the Trigger and Data Acquisition system. Global Trigger is a new subsystem, which will perform offline-like algorithms on full-granularity calorimeter data. The hardware implementation of the Global Trigger consists of three primary components: Multiplexer Processor layer, Global Event Processing layer, and demultiplexing Global-to-CTP Interface, all of which have identical hardware. The single Global Common Module hardware is implemented across the Global Trigger system. |
id | cern-2791015 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | cern-27910152021-11-19T20:45:47Zhttp://cds.cern.ch/record/2791015engBonini, FilibertoTang, ShaochunPrototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II UpgradeParticle Physics - ExperimentThe HL-LHC will start operations in 2027, to deliver more than ten times the integrated luminosity of the LHC Runs 1-3 combined. Meeting these requirements poses significant challenges to the hardware design of the Trigger and Data Acquisition system. Global Trigger is a new subsystem, which will perform offline-like algorithms on full-granularity calorimeter data. The hardware implementation of the Global Trigger consists of three primary components: Multiplexer Processor layer, Global Event Processing layer, and demultiplexing Global-to-CTP Interface, all of which have identical hardware. The single Global Common Module hardware is implemented across the Global Trigger system.ATL-DAQ-SLIDE-2021-698oai:cds.cern.ch:27910152021-11-19 |
spellingShingle | Particle Physics - Experiment Bonini, Filiberto Tang, Shaochun Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade |
title | Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade |
title_full | Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade |
title_fullStr | Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade |
title_full_unstemmed | Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade |
title_short | Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade |
title_sort | prototype hardware design and testing of the global common module (gcm) for the global trigger subsystem of the atlas phase-ii upgrade |
topic | Particle Physics - Experiment |
url | http://cds.cern.ch/record/2791015 |
work_keys_str_mv | AT boninifiliberto prototypehardwaredesignandtestingoftheglobalcommonmodulegcmfortheglobaltriggersubsystemoftheatlasphaseiiupgrade AT tangshaochun prototypehardwaredesignandtestingoftheglobalcommonmodulegcmfortheglobaltriggersubsystemoftheatlasphaseiiupgrade |