Cargando…
CERN Proton Synchrotron East Area Facility: Upgrades and renovation during Long Shutdown 2
In this document, we present the upgrade of the East Experimental Area facility which took place during the Long Shutdown 2 (2019–2021). This document covers the renovation of the East Hall beamlines and infrastructure according to a new layout with the goal of improving the magnet and radiation sit...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2021-004 http://cds.cern.ch/record/2792490 |