Cargando…
Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS phase-2 muon system upgrade
The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon flux in the forward re...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/17/05/C05002 http://cds.cern.ch/record/2797681 |