Cargando…

Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC

In this report we assess the feasibility for installation of the $Nb_{3}$Sn MBH S2 magnet in the LHC and conclude on possible performance limitations.

Detalles Bibliográficos
Autores principales: Siemko, Andrzej, Devred, Arnaud, Rodriguez Mateos, Felix, Schmidt, Rudiger, Verweij, Arjan, Wenninger, Jorg
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2805691