Cargando…
Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC
In this report we assess the feasibility for installation of the $Nb_{3}$Sn MBH S2 magnet in the LHC and conclude on possible performance limitations.
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2805691 |
_version_ | 1780972944755785728 |
---|---|
author | Siemko, Andrzej Devred, Arnaud Rodriguez Mateos, Felix Schmidt, Rudiger Verweij, Arjan Wenninger, Jorg |
author_facet | Siemko, Andrzej Devred, Arnaud Rodriguez Mateos, Felix Schmidt, Rudiger Verweij, Arjan Wenninger, Jorg |
author_sort | Siemko, Andrzej |
collection | CERN |
description | In this report we assess the feasibility for installation of the $Nb_{3}$Sn MBH S2 magnet in the LHC and conclude on possible performance limitations. |
id | cern-2805691 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | cern-28056912022-04-06T19:06:30Zhttp://cds.cern.ch/record/2805691engSiemko, AndrzejDevred, ArnaudRodriguez Mateos, FelixSchmidt, RudigerVerweij, ArjanWenninger, JorgConclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHCAccelerators and Storage RingsIn this report we assess the feasibility for installation of the $Nb_{3}$Sn MBH S2 magnet in the LHC and conclude on possible performance limitations.CERN-ACC-2021-013oai:cds.cern.ch:28056912021-03-01 |
spellingShingle | Accelerators and Storage Rings Siemko, Andrzej Devred, Arnaud Rodriguez Mateos, Felix Schmidt, Rudiger Verweij, Arjan Wenninger, Jorg Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC |
title | Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC |
title_full | Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC |
title_fullStr | Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC |
title_full_unstemmed | Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC |
title_short | Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC |
title_sort | conclusion of the electrical conformity assessment panel on the installation of the mbh magnet s2 in the lhc |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2805691 |
work_keys_str_mv | AT siemkoandrzej conclusionoftheelectricalconformityassessmentpanelontheinstallationofthembhmagnets2inthelhc AT devredarnaud conclusionoftheelectricalconformityassessmentpanelontheinstallationofthembhmagnets2inthelhc AT rodriguezmateosfelix conclusionoftheelectricalconformityassessmentpanelontheinstallationofthembhmagnets2inthelhc AT schmidtrudiger conclusionoftheelectricalconformityassessmentpanelontheinstallationofthembhmagnets2inthelhc AT verweijarjan conclusionoftheelectricalconformityassessmentpanelontheinstallationofthembhmagnets2inthelhc AT wenningerjorg conclusionoftheelectricalconformityassessmentpanelontheinstallationofthembhmagnets2inthelhc |