Cargando…
Design, Construction and Testing of a Magnetic Probe for Fast Kicker Magnets
The CERN PS injection kicker has been modified in the framework of the LHC Injector Upgrade (LIU) project to allow injecting proton beams with an energy of 2 GeV. One of the most important items of the system parameter validation is the measurement and analysis of the magnetic field in the magnet ap...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-WEPAB347 http://cds.cern.ch/record/2810017 |