Cargando…
Design, Construction and Testing of a Magnetic Probe for Fast Kicker Magnets
The CERN PS injection kicker has been modified in the framework of the LHC Injector Upgrade (LIU) project to allow injecting proton beams with an energy of 2 GeV. One of the most important items of the system parameter validation is the measurement and analysis of the magnetic field in the magnet ap...
Autores principales: | Ayala Cintas, Núria, Ferrero Colomo, Álvaro, Kramer, Thomas |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-WEPAB347 http://cds.cern.ch/record/2810017 |
Ejemplares similares
-
Performance validation of the existing and upgraded PS injection kicker
por: Ferrero Colomo, Alvaro, et al.
Publicado: (2019) -
Feasibility Study of the Fast SPS Ion Injection Kicker System
por: Ferrero Colomo, Alvaro, et al.
Publicado: (2016) -
Magnetic Waveform Measurements of the PS Injection Kicker KFA45 and Future Emittance Growth Estimates
por: Forte, Vincenzo, et al.
Publicado: (2018) -
Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode
por: Kramer, Thomas, et al.
Publicado: (2021) -
CERN PS Kicker for Proton Injection: from Beam-Based Waveform Measurements to Hardware Improvements
por: Forte, Vincenzo, et al.
Publicado: (2018)