Cargando…
5 MW Beam Power in the ESSnuSB Accumulator: A Way to Manage Foil Stripping Injection at 14 Hz Linac Pulse Rate
In the past, the scenario for foil stripping consisted of splitting a linac pulse into 4 rings, or 3 or 4 intermediate pulses, and one ring. At present, the scenario, in view of laser stripping, consists of one ring, one pulse, split into four batches. Conventional stripping geometry would lead to f...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-THPAB165 http://cds.cern.ch/record/2811416 |