Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode
Within the framework of the LHC Injector Upgrade (LIU) project, the feasibility and design of an upgrade of the existing CERN PS proton injection kicker system have been outlined in previous publications already. This paper describes the adjustments of final design choices, testing, and deployment a...
Autores principales: | , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-THPAB354 http://cds.cern.ch/record/2811865 |
_version_ | 1780973310721392640 |
---|---|
author | Kramer, Thomas Ayala Cintas, Nuria Borburgh, Jan Burkel, Peter Carlier, Etienne Ducimetière, Laurent Feliciano, Luís M C Ferrero Colomo, Álvaro Fraser, Matthew A Govertsen, Leif A Noulibos, Remy Pavis, Steven Sermeus, Luc |
author_facet | Kramer, Thomas Ayala Cintas, Nuria Borburgh, Jan Burkel, Peter Carlier, Etienne Ducimetière, Laurent Feliciano, Luís M C Ferrero Colomo, Álvaro Fraser, Matthew A Govertsen, Leif A Noulibos, Remy Pavis, Steven Sermeus, Luc |
author_sort | Kramer, Thomas |
collection | CERN |
description | Within the framework of the LHC Injector Upgrade (LIU) project, the feasibility and design of an upgrade of the existing CERN PS proton injection kicker system have been outlined in previous publications already. This paper describes the adjustments of final design choices, testing, and deployment as well as the validation and commissioning of the new 2 GeV injection kicker system. The upgrade pays particular attention to the reduction of pulse reflections unavoidably induced by a magnet in short circuit mode configuration whilst keeping a fast 10⁴ ns rise and fall time. An adapted thyratron triggering system to reduce jitter and enhance thyratron lifetime is outlined. Additionally, improvements to the magnet entry box and the elimination of SF6 gas in the magnet connection box and the associated pulse transmission lines are discussed. |
id | cern-2811865 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
publisher | JACoW |
record_format | invenio |
spelling | cern-28118652022-06-10T23:32:21Zdoi:10.18429/JACoW-IPAC2021-THPAB354http://cds.cern.ch/record/2811865engKramer, ThomasAyala Cintas, NuriaBorburgh, JanBurkel, PeterCarlier, EtienneDucimetière, LaurentFeliciano, Luís M CFerrero Colomo, ÁlvaroFraser, Matthew AGovertsen, Leif ANoulibos, RemyPavis, StevenSermeus, LucDeployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit ModeAccelerators and Storage RingsWithin the framework of the LHC Injector Upgrade (LIU) project, the feasibility and design of an upgrade of the existing CERN PS proton injection kicker system have been outlined in previous publications already. This paper describes the adjustments of final design choices, testing, and deployment as well as the validation and commissioning of the new 2 GeV injection kicker system. The upgrade pays particular attention to the reduction of pulse reflections unavoidably induced by a magnet in short circuit mode configuration whilst keeping a fast 10⁴ ns rise and fall time. An adapted thyratron triggering system to reduce jitter and enhance thyratron lifetime is outlined. Additionally, improvements to the magnet entry box and the elimination of SF6 gas in the magnet connection box and the associated pulse transmission lines are discussed.JACoWoai:cds.cern.ch:28118652021 |
spellingShingle | Accelerators and Storage Rings Kramer, Thomas Ayala Cintas, Nuria Borburgh, Jan Burkel, Peter Carlier, Etienne Ducimetière, Laurent Feliciano, Luís M C Ferrero Colomo, Álvaro Fraser, Matthew A Govertsen, Leif A Noulibos, Remy Pavis, Steven Sermeus, Luc Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode |
title | Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode |
title_full | Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode |
title_fullStr | Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode |
title_full_unstemmed | Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode |
title_short | Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode |
title_sort | deployment and commissioning of the cern ps injection kicker system for operation with 2 gev beams in short circuit mode |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2021-THPAB354 http://cds.cern.ch/record/2811865 |
work_keys_str_mv | AT kramerthomas deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT ayalacintasnuria deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT borburghjan deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT burkelpeter deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT carlieretienne deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT ducimetierelaurent deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT felicianoluismc deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT ferrerocolomoalvaro deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT frasermatthewa deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT govertsenleifa deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT noulibosremy deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT pavissteven deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode AT sermeusluc deploymentandcommissioningofthecernpsinjectionkickersystemforoperationwith2gevbeamsinshortcircuitmode |