Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode
Within the framework of the LHC Injector Upgrade (LIU) project, the feasibility and design of an upgrade of the existing CERN PS proton injection kicker system have been outlined in previous publications already. This paper describes the adjustments of final design choices, testing, and deployment a...
Autores principales: | Kramer, Thomas, Ayala Cintas, Nuria, Borburgh, Jan, Burkel, Peter, Carlier, Etienne, Ducimetière, Laurent, Feliciano, Luís M C, Ferrero Colomo, Álvaro, Fraser, Matthew A, Govertsen, Leif A, Noulibos, Remy, Pavis, Steven, Sermeus, Luc |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-THPAB354 http://cds.cern.ch/record/2811865 |
Ejemplares similares
-
Performance validation of the existing and upgraded PS injection kicker
por: Ferrero Colomo, Alvaro, et al.
Publicado: (2019) -
Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams
por: Kramer, Thomas, et al.
Publicado: (2017) -
Feasibility Study of the PS Injection for 2 GeV LIU Beams with an Upgraded KFA-45 Injection Kicker System Operating in Short Circuit Mode
por: Kramer, Thomas, et al.
Publicado: (2016) -
Feasibility Study of the Fast SPS Ion Injection Kicker System
por: Ferrero Colomo, Alvaro, et al.
Publicado: (2016) -
Beam-Based Waveform Measurements of the CERN PS Injection Kicker
por: Forte, Vincenzo, et al.
Publicado: (2017)