SPS Personnel Protection System: From Design to Commissioning

During the second long shutdown (LS2) of the accelerator complex at CERN, the access system of the Super Proton Synchrotron (SPS) was completely renovated. This complex project was motivated by the technical obsolescence and lack of sufficient redundancy in the existing system, as well as by the nee...

Descripción completa

Detalles Bibliográficos
Autores principales: Ladzinski, Tomasz, Hakulinen, Timo, Havart, Frederic, Martins De Sousa Dos Rios, Vitor, Munoz Codoceo, Miriam, Ninin, Pierre, Ridewood, James, Sanchez-Corral Mena, Eva, Vaxelaire, Didier