Cargando…
SPS Personnel Protection System: From Design to Commissioning
During the second long shutdown (LS2) of the accelerator complex at CERN, the access system of the Super Proton Synchrotron (SPS) was completely renovated. This complex project was motivated by the technical obsolescence and lack of sufficient redundancy in the existing system, as well as by the nee...
Autores principales: | Ladzinski, Tomasz, Hakulinen, Timo, Havart, Frederic, Martins De Sousa Dos Rios, Vitor, Munoz Codoceo, Miriam, Ninin, Pierre, Ridewood, James, Sanchez-Corral Mena, Eva, Vaxelaire, Didier |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2021-TUPAB314 http://cds.cern.ch/record/2812526 |
Ejemplares similares
-
New concepts for access devices in the SPS personnel protection system
por: Ladzinski, Tomasz, et al.
Publicado: (2018) -
Personnel Protection of the CERN SPS North Hall in Fixed Target Primary Ion Mode
por: Hakulinen, T, et al.
Publicado: (2014) -
Renovation of the SPS Personnel Protection System: A Configurable Approach
por: Ladzinski, Tomasz, et al.
Publicado: (2020) -
LHC Access System: from Design to Operation
por: Pettersson, Thomas Sven, et al.
Publicado: (2008) -
Refurbishing of the CERN PS Complex Personnel Protection System
por: Ninin, P, et al.
Publicado: (2014)