Cargando…
Feedback from the Experiments on the 2017 Run
This talk will cover feedback from the experiments on the 2017 run, including the high luminosity 13 TeV running, as well as the scheduled special runs that took place. It will include feedback on the 8b4e BCS scheme that was developed as a mitigation of the 16L2 issue observed during the 2017 run....
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2813529 |