Cargando…

Feedback from the Experiments on the 2017 Run

This talk will cover feedback from the experiments on the 2017 run, including the high luminosity 13 TeV running, as well as the scheduled special runs that took place. It will include feedback on the 8b4e BCS scheme that was developed as a mitigation of the 16L2 issue observed during the 2017 run....

Descripción completa

Detalles Bibliográficos
Autores principales: Boyd, J, Schwick, C
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2813529
Descripción
Sumario:This talk will cover feedback from the experiments on the 2017 run, including the high luminosity 13 TeV running, as well as the scheduled special runs that took place. It will include feedback on the 8b4e BCS scheme that was developed as a mitigation of the 16L2 issue observed during the 2017 run. In addition it will cover feedback on new operational features that were implemented for the first time in 2017, for example the RF full-detuning, crossing-angle anti- levelling, luminosity levelling, and the use of 30cm $\beta$* with ATS optics.