Cargando…
Continuous data taking with the upgraded ALICE GEM-TPC
<!--HTML--><p><span><span>During the long shutdown 2 of the LHC, the ALICE Time Projection Chamber (TPC) was upgraded in order to cope with the increased Pb-Pb interaction rate of 50 kHz planned for Run 3. The MWPC-based amplification system was replaced by stack of 4 Gas Ele...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2813650 |