Cargando…
Continuous data taking with the upgraded ALICE GEM-TPC
<!--HTML--><p><span><span>During the long shutdown 2 of the LHC, the ALICE Time Projection Chamber (TPC) was upgraded in order to cope with the increased Pb-Pb interaction rate of 50 kHz planned for Run 3. The MWPC-based amplification system was replaced by stack of 4 Gas Ele...
Autor principal: | Munzer, Robert Helmut |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2813650 |
Ejemplares similares
-
The upgrade of the ALICE TPC with GEMs and continuous readout
por: Adolfsson, J., et al.
Publicado: (2020) -
From gated to continuous readout - the GEM upgrade of the ALICE TPC
por: Mathis, Andreas
Publicado: (2018) -
Performance simulation studies for the ALICE TPC GEM upgrade
por: Ljunggren, M
Publicado: (2016) -
Ion backflow studies for the ALICE TPC upgrade with GEMs
por: Ball, M, et al.
Publicado: (2014) -
Building of a 4-GEM prototype for ALICE-TPC upgrade
por: Swain, S, et al.
Publicado: (2016)