Cargando…

Recommissioning of the CERN AD Stochastic Cooling System in 2021 after Long Shutdown 2

The power system of the Stochastic Cooling System of the anti-proton decelerator AD at CERN, installed on top of the shielding blocks of the AD ring, was completely dismantled during the long shutdown 2 (LS2) at the end of the 2018 run in order to gain access to the accelerator for magnet consolidat...

Descripción completa

Detalles Bibliográficos
Autores principales: Höfle, Wolfgang, Carli, Christian, Caspers, Fritz, Dupuy, Bruno, Gamba, Davide, Louwerse, Reinier, Myklebust, Vebjorn Roed, Oliveira, Joao Carlos, Ponce, Laurette, Rey, Stephane, Thorndahl, Lars
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-COOL2021-S302
http://cds.cern.ch/record/2816638