Cargando…
Recommissioning of the CERN AD Stochastic Cooling System in 2021 after Long Shutdown 2
The power system of the Stochastic Cooling System of the anti-proton decelerator AD at CERN, installed on top of the shielding blocks of the AD ring, was completely dismantled during the long shutdown 2 (LS2) at the end of the 2018 run in order to gain access to the accelerator for magnet consolidat...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-COOL2021-S302 http://cds.cern.ch/record/2816638 |