Cargando…
Talking with HGCROCv2 in Train System v2
CMS will have a major upgrade during the LS3. As a part of this upgrade a new endcap calorimeter (HGCAL) will be built. To establish and test the communication channel between front-end electronics (HGCROC) and back-end, a prototype system (Train) is needed. This report focuses on upgrades of the Tr...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2826621 |