Cargando…

Talking with HGCROCv2 in Train System v2

CMS will have a major upgrade during the LS3. As a part of this upgrade a new endcap calorimeter (HGCAL) will be built. To establish and test the communication channel between front-end electronics (HGCROC) and back-end, a prototype system (Train) is needed. This report focuses on upgrades of the Tr...

Descripción completa

Detalles Bibliográficos
Autor principal: Demirbas, Umut
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:http://cds.cern.ch/record/2826621
Descripción
Sumario:CMS will have a major upgrade during the LS3. As a part of this upgrade a new endcap calorimeter (HGCAL) will be built. To establish and test the communication channel between front-end electronics (HGCROC) and back-end, a prototype system (Train) is needed. This report focuses on upgrades of the Train System v2. The project which is described in this report aims to connect HGCROCs to the Train System v2 and establish a communication channel with the HGCROCs.