Cargando…
Talking with HGCROCv2 in Train System v2
CMS will have a major upgrade during the LS3. As a part of this upgrade a new endcap calorimeter (HGCAL) will be built. To establish and test the communication channel between front-end electronics (HGCROC) and back-end, a prototype system (Train) is needed. This report focuses on upgrades of the Tr...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2826621 |
Sumario: | CMS will have a major upgrade during the LS3. As a part of this upgrade a new endcap calorimeter (HGCAL) will be built. To establish and test the communication channel between front-end electronics (HGCROC) and back-end, a prototype system (Train) is needed. This report focuses on upgrades of the Train System v2. The project which is described in this report aims to connect HGCROCs to the Train System v2 and establish a communication channel with the HGCROCs. |
---|