Cargando…
Talking with HGCROCv2 in Train System v2
CMS will have a major upgrade during the LS3. As a part of this upgrade a new endcap calorimeter (HGCAL) will be built. To establish and test the communication channel between front-end electronics (HGCROC) and back-end, a prototype system (Train) is needed. This report focuses on upgrades of the Tr...
Autor principal: | Demirbas, Umut |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2826621 |
Ejemplares similares
-
Introductory talk
por: Charpak, Georges
Publicado: (1995) -
Summary Talk
por: Borghini, Michel
Publicado: (1979) -
ATLAS Highlights (plenary talk at PASCOS 2013 conference - talk scheduled for 40 min)
por: Wingerter-Seez, I
Publicado: (2013) -
CMS BSM short talk
por: Apparu, Dylan Angie Frank
Publicado: (2022) -
A CMS overview talk
por: Dorigo, Tommaso
Publicado: (2014)