Cargando…

Preparation for ALICE data processing and analysis in LHC Run 3

After the ALICE Long Shutdown 2 detector upgrades, including a new silicon tracker and a GEM-based readout for the TPC, the experiment will operate during LHC Run 3 at a peak Pb-Pb collision rate of 50 kHz, about 50 times higher than in previous running periods. To maximise the significance of physi...

Descripción completa

Detalles Bibliográficos
Autor principal: Eulisse, Giulio
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:https://dx.doi.org/10.22323/1.398.0824
http://cds.cern.ch/record/2827240