Cargando…
Status of the Fast Interaction Trigger detector for the ALICE upgrade
During the second Long Shutdown (LS2) of the LHC, ALICE has installed three new detectors and implemented continuous data readout with online reconstruction and data compression for several other subsystems. The changes are needed to benefit from the increased luminosity of the LHC during Run 3 and...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.398.0795 http://cds.cern.ch/record/2827266 |