Cargando…
Status of the Fast Interaction Trigger detector for the ALICE upgrade
During the second Long Shutdown (LS2) of the LHC, ALICE has installed three new detectors and implemented continuous data readout with online reconstruction and data compression for several other subsystems. The changes are needed to benefit from the increased luminosity of the LHC during Run 3 and...
Autor principal: | Rojas Torres, Solangel |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.398.0795 http://cds.cern.ch/record/2827266 |
Ejemplares similares
-
The Fast Interaction Trigger detector for the ALICE Upgrade
por: Karavicheva, T L
Publicado: (2017) -
Status of Fast Interaction Trigger for ALICE Upgrade
por: Karavicheva, T L, et al.
Publicado: (2015) -
Status of the Fast Interaction Trigger for ALICE Upgrade
por: Slupecki, Maciej
Publicado: (2021) -
Fast Interaction Trigger for ALICE upgrade
por: Slupecki, Maciej
Publicado: (2022) -
The Fast Interaction Trigger Upgrade for ALICE
por: Garcia-Solis, Edmundo
Publicado: (2016)