Modification of the LEP electrostatic separator systems for operation with bunch trains

To meet the LEP2 luminosity requirements for W-pair production, it is planned to operate LEP with Bunch Trains from 1995 onwards. This new mode of operation entails significant modification both to the existing separator hardware and its control system. The changes have been implemented so as to pro...