Modification of the LEP electrostatic separator systems for operation with bunch trains

To meet the LEP2 luminosity requirements for W-pair production, it is planned to operate LEP with Bunch Trains from 1995 onwards. This new mode of operation entails significant modification both to the existing separator hardware and its control system. The changes have been implemented so as to pro...

Descripción completa

Detalles Bibliográficos
Autores principales: Balhan, B, Burton, A, Carlier, E, Deluen, J P, Dieperink, J H, Garrel, N, Goddard, B, Guinand, R, Kalbreier, Willi, Laffin, M, Lamont, M, Mertens, V, Poole, John, Verhagen, H
Lenguaje:eng
Publicado: 1995
Materias:
Acceso en línea:http://cds.cern.ch/record/282846
_version_ 1780888062093426688
author Balhan, B
Burton, A
Carlier, E
Deluen, J P
Dieperink, J H
Garrel, N
Goddard, B
Guinand, R
Kalbreier, Willi
Laffin, M
Lamont, M
Mertens, V
Poole, John
Verhagen, H
author_facet Balhan, B
Burton, A
Carlier, E
Deluen, J P
Dieperink, J H
Garrel, N
Goddard, B
Guinand, R
Kalbreier, Willi
Laffin, M
Lamont, M
Mertens, V
Poole, John
Verhagen, H
author_sort Balhan, B
collection CERN
description To meet the LEP2 luminosity requirements for W-pair production, it is planned to operate LEP with Bunch Trains from 1995 onwards. This new mode of operation entails significant modification both to the existing separator hardware and its control system. The changes have been implemented so as to provide maximum flexibility for the realisation of the Bunch Train scheme, and also make a return to operation with Pretzel separation possible during 1995. Two LEP Interaction Points (IP) were equipped with new separators in late 1994, enabling first tests with the collision of one train of four e+ bunches with one train of e- bunches. During the 1994/95 shutdown, four separators have been installed in the two remaining experimental IPs, and eight separators in the non-experimental IP have been displaced to new positions. Details are given of optics requirements for the separator installations, the polarity of the closed orbit separator bumps, system modifications, and performance considerations. Results are presented of investigations into the effects of separator polarity on High Voltage performance and on the commissioning of the new hardware systems during tests of the Bunch Train scheme in 1994.
id cern-282846
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1995
record_format invenio
spelling cern-2828462023-05-05T12:57:17Zhttp://cds.cern.ch/record/282846engBalhan, BBurton, ACarlier, EDeluen, J PDieperink, J HGarrel, NGoddard, BGuinand, RKalbreier, WilliLaffin, MLamont, MMertens, VPoole, JohnVerhagen, HModification of the LEP electrostatic separator systems for operation with bunch trainsAccelerators and Storage RingsTo meet the LEP2 luminosity requirements for W-pair production, it is planned to operate LEP with Bunch Trains from 1995 onwards. This new mode of operation entails significant modification both to the existing separator hardware and its control system. The changes have been implemented so as to provide maximum flexibility for the realisation of the Bunch Train scheme, and also make a return to operation with Pretzel separation possible during 1995. Two LEP Interaction Points (IP) were equipped with new separators in late 1994, enabling first tests with the collision of one train of four e+ bunches with one train of e- bunches. During the 1994/95 shutdown, four separators have been installed in the two remaining experimental IPs, and eight separators in the non-experimental IP have been displaced to new positions. Details are given of optics requirements for the separator installations, the polarity of the closed orbit separator bumps, system modifications, and performance considerations. Results are presented of investigations into the effects of separator polarity on High Voltage performance and on the commissioning of the new hardware systems during tests of the Bunch Train scheme in 1994.CERN-SL-95-45-BToai:cds.cern.ch:2828461995-06-02
spellingShingle Accelerators and Storage Rings
Balhan, B
Burton, A
Carlier, E
Deluen, J P
Dieperink, J H
Garrel, N
Goddard, B
Guinand, R
Kalbreier, Willi
Laffin, M
Lamont, M
Mertens, V
Poole, John
Verhagen, H
Modification of the LEP electrostatic separator systems for operation with bunch trains
title Modification of the LEP electrostatic separator systems for operation with bunch trains
title_full Modification of the LEP electrostatic separator systems for operation with bunch trains
title_fullStr Modification of the LEP electrostatic separator systems for operation with bunch trains
title_full_unstemmed Modification of the LEP electrostatic separator systems for operation with bunch trains
title_short Modification of the LEP electrostatic separator systems for operation with bunch trains
title_sort modification of the lep electrostatic separator systems for operation with bunch trains
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/282846
work_keys_str_mv AT balhanb modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT burtona modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT carliere modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT deluenjp modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT dieperinkjh modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT garreln modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT goddardb modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT guinandr modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT kalbreierwilli modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT laffinm modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT lamontm modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT mertensv modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT poolejohn modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains
AT verhagenh modificationofthelepelectrostaticseparatorsystemsforoperationwithbunchtrains