Cargando…
Modification of the LEP electrostatic separator systems for operation with bunch trains
To meet the LEP2 luminosity requirements for W-pair production, it is planned to operate LEP with Bunch Trains from 1995 onwards. This new mode of operation entails significant modification both to the existing separator hardware and its control system. The changes have been implemented so as to pro...
Autores principales: | Balhan, B, Burton, A, Carlier, E, Deluen, J P, Dieperink, J H, Garrel, N, Goddard, B, Guinand, R, Kalbreier, Willi, Laffin, M, Lamont, M, Mertens, V, Poole, John, Verhagen, H |
---|---|
Lenguaje: | eng |
Publicado: |
1995
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/282846 |
Ejemplares similares
-
Separator systems for the LEP bunch train project
por: Balhan, B, et al.
Publicado: (1994) -
The evolution of LEP separator controls in the wake of the bunch train project
por: Brignet, A K, et al.
Publicado: (1995) -
Automatic high voltage conditioning of the electrostatic LEP separators without conventional programming
por: Balhan, B, et al.
Publicado: (1995) -
Modified LEP separator configurations for operation with bunch trains
por: Goddard, B J, et al.
Publicado: (1994) -
Commissioning and operating experience with the electrostatic beam separation system of the LEP e+e- collider
por: Kalbreier, Willi, et al.
Publicado: (1990)