Cargando…
Performance and Improvements of the ATLAS Level-1 Muon Trigger for Run 3
The LHC is restarting the Run-3 operation with keeping longer time with an instantaneous luminosity of about $2.0×10^{34} cm^{-2}s^{-1}$ from this year to 2025. In order to cope with the high event rate, upgrades of the ATLAS Level-1 Muon trigger system were required. The Level-1 Muon trigger system...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2835554 |