Cargando…

Performance and Improvements of the ATLAS Level-1 Muon Trigger for Run 3

The LHC is restarting the Run-3 operation with keeping longer time with an instantaneous luminosity of about $2.0×10^{34} cm^{-2}s^{-1}$ from this year to 2025. In order to cope with the high event rate, upgrades of the ATLAS Level-1 Muon trigger system were required. The Level-1 Muon trigger system...

Descripción completa

Detalles Bibliográficos
Autores principales: Hayashi, Yuichiro, ATLAS Collaboration
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:http://cds.cern.ch/record/2835554

Ejemplares similares