Cargando…
Developing and Validating OPC-UA Based Industrial Controls for Power Supplies at CERN
The industrial control systems of CERN’s experiments are undergoing major renovation since 2017 and well into CERN’s second Long Shutdown (LS2) until the end of 2019. Each detector power-supply control system runs several hundred software instances consisting of many different components in parallel...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-PCaPAC2018-WEP04 http://cds.cern.ch/record/2836174 |