Cargando…
The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
The ATLAS SemiConductor Tracker (SCT) had been maintained during the long shutdown 2 (LS2) and restarted operations in LHC Run-3. As reported in the previous VERTEX conference, the SCT successfully operated in LHC Run-2 (2015-2018) which came with high instantaneous luminosity and pileup conditions...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2022
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2838345 |