Cargando…

The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations

The ATLAS SemiConductor Tracker (SCT) had been maintained during the long shutdown 2 (LS2) and restarted operations in LHC Run-3. As reported in the previous VERTEX conference, the SCT successfully operated in LHC Run-2 (2015-2018) which came with high instantaneous luminosity and pileup conditions...

Descripción completa

Detalles Bibliográficos
Autor principal: Borecka-Bielska, Hanna Maria
Lenguaje:eng
Publicado: 2022
Materias:
Acceso en línea:http://cds.cern.ch/record/2838345
_version_ 1780975917457211392
author Borecka-Bielska, Hanna Maria
author_facet Borecka-Bielska, Hanna Maria
author_sort Borecka-Bielska, Hanna Maria
collection CERN
description The ATLAS SemiConductor Tracker (SCT) had been maintained during the long shutdown 2 (LS2) and restarted operations in LHC Run-3. As reported in the previous VERTEX conference, the SCT successfully operated in LHC Run-2 (2015-2018) which came with high instantaneous luminosity and pileup conditions that were far in excess of what the SCT was originally designed to meet. The first significant effects of radiation damage in the SCT were also observed during Run-2. The operation condition of SCT from LHC Run-3 is expected to be the same as those in Run-2. This talk will summarise the operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations. Also the observation and prospect of the radiation damage on SCT silicon strip sensors will be presented.
id cern-2838345
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2022
record_format invenio
spelling cern-28383452022-10-26T19:02:22Zhttp://cds.cern.ch/record/2838345engBorecka-Bielska, Hanna MariaThe operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operationsParticle Physics - ExperimentThe ATLAS SemiConductor Tracker (SCT) had been maintained during the long shutdown 2 (LS2) and restarted operations in LHC Run-3. As reported in the previous VERTEX conference, the SCT successfully operated in LHC Run-2 (2015-2018) which came with high instantaneous luminosity and pileup conditions that were far in excess of what the SCT was originally designed to meet. The first significant effects of radiation damage in the SCT were also observed during Run-2. The operation condition of SCT from LHC Run-3 is expected to be the same as those in Run-2. This talk will summarise the operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations. Also the observation and prospect of the radiation damage on SCT silicon strip sensors will be presented.ATL-INDET-SLIDE-2022-558oai:cds.cern.ch:28383452022-10-25
spellingShingle Particle Physics - Experiment
Borecka-Bielska, Hanna Maria
The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
title The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
title_full The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
title_fullStr The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
title_full_unstemmed The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
title_short The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
title_sort operational experience and performance of the sct during run-2 and ls2, and the first impression from run3 operations
topic Particle Physics - Experiment
url http://cds.cern.ch/record/2838345
work_keys_str_mv AT boreckabielskahannamaria theoperationalexperienceandperformanceofthesctduringrun2andls2andthefirstimpressionfromrun3operations
AT boreckabielskahannamaria operationalexperienceandperformanceofthesctduringrun2andls2andthefirstimpressionfromrun3operations